Achievements

Since the formation of Maxsuselektrtarmoqqurilish JSC, work has been carried out on the facilities:
Construction of 220 kV overhead line Tash. GRES – Tashkent substation
Construction of 220 kV overhead line Karshi NS-7 – Talimarzhanskaya TPP
Construction of 110 kV overhead line of Traktornaya substation – Jubilee substation
Construction of a 500 kV Tashkent substation
Reconstruction of 500 kV overhead line Syrdarya GRES – Gusar substation
Reconstruction of 220 kV overhead line in the area of Tashkent– Chimgan –Charvak highway
Reconstruction of a/road 4P6 Tashkent – Chirchik – Chimgan – 4P1. Tashkent ring road bypassing the village of Durmen.
Transitions and reconstruction of overhead lines-110 kV.
Installation of 220 kV Charvak – Chirchikskaya overhead line at 500 kV Tashkent substation
110 kV overhead line construction of a hydroelectric power station at the Tupolang reservoir of Surkhandarya viloyat
Reconstruction of 220/110/10 kV Sari Bazaar substation
Electrification of railway uch. Tukimachi – Angren. Reconstruction of 35-500 kV overhead line crossings
Uzbekistanskaya 500 kV substation and Novo-Angrenskaya TPP 500 kV overhead line – Uzbekistanskaya substation
Construction of a double—track electrified Jizzakh-Yangyor railway line and a single-track electrified Yangyor—Farhad railway line. Reconstruction of intersections of existing 110 — 500 kV transmission lines
Construction, installation and drilling and blasting operations at 500 kV overhead line Talimardzhanskaya TPP — Sogdiana substation
Construction and installation works at the Navoi substation
Construction of 220 kV overhead line. Denau — Gulcha substation bridge and dismantling works on 220 kV overhead line L — 201
Organization of high—speed passenger train traffic on a section of the Tashkent-Samarkand railway line.
Rearrangement of intersections of entities. 110 — 500 kV transmission line on the Gallaaral — Bulungur section
Construction of a two-chain electrified railway line Yangier Jizzakh. Reconstruction of intersections of existing 110 — 500 kV transmission lines
Construction of 500 kV overhead line SDTPP — Novo-Angrenskaya TPP
and others